Redesigining of dryer and absorber towers of old sulphuric acid unit ‎.
Schedule
Commencement Date : 11/26/2000 Duration : 13Months
Executive Actions
Modeling the unit – demister pad study – investigating acid distribution ‎system - considering the different types of paking - investigating brick ‎system – providing Isometric drawings - proposing computerized program.‎
Basic Contractor
Mr. Atash nejad
Description

Identifier Code : ‎79211062‎
 Contract Code :‎78/104 ‎


 According  to  dryer  and  absorber  towers  problems  in  old  sulphuric  acid  unit , these  two  towers  should  be  changed  in  the  future . In  order  to  redesign   the  different  internal  parts ,  acid  drops  remedy  system , Acid  distribution  system , packing  and  their  supports  with  construction  drawings  are  included  in  the  project contract.

So , after  modeling  the  unit , above  mentioned  problems  will   be  investigated  and  their  redesigning  will  be  done.