Project Details

Inspection instruction of complex’s electrical power
Inspection instruction of complex’s electrical power
: Completed
2008/11/04
2008/11/04
Goals
Codified instruction according to IPS and API standards
Schedule
Commencement Date : 12/3/2001 Duration : 6Months
Executive Actions
1-Investigating the complex electrical system and electrical equipment. 2-Investigating manufacturer power inspection rules and international standards and conforming them. 3-Providing and collecting the technical inspection instruction book.
Basic Contractor
eng. ali akbar afshar zadeh
Description
Contract Code: 80/074
According to complex precedence, plants long life and their depreciation and necessitate of production continuity, written protection and investigation by distinct prescription and coincide with universal standards was necessary. So, performing this project is recognized necessary and it is done. Therefore by using the prescription, investigation and protection with a distinct frame is defined for related personnel. So, using it prevents time and capital remedy, decreases operational treatment and it is effective in production continuity.