Project Details R.O pilot plant R.O pilot plant Status: In Progress Registration Date 2008/11/04 Update Date 2008/11/04 Goals Providing the operational researching field and optimizing the R.O system by using the results of applicable test in pilot plant Schedule Commencement Date : 6/9/2001 Duration : 9Months Basic Contractor MOHAMAD ALI LAK Description Contract Code 80/015 Since, R.O system in view point of the process type, quality, material and structure of membranes, has some limitations such as, time and accessibility to the system operation in each section of process and on the other hand this system is always exposed to fouling which can be different from operational conditions and feed analyze, and also maybe the type of mineral and organic scales, biologic scales and the process of micro organisms growth are different in various parts of the system then providing a special prescription for remedying the problems in above situations are not possible so, it seemed necessary to make a pilot plant for R.O system which can provide a better operational conditions with guess and error during the researching tests