Project Details Evaluating the operation of transfusion technical material into Water by using computerized program Evaluating the operation of transfusion technical material into Water by using computerized program Status: Completed Registration Date 2008/11/04 Update Date 2008/11/04 Goals Acceleration of performance and optimizing the operation condition. Schedule Commencement Date : 10/10/1998 Duration : 12Months Executive Actions 1-primary studies. 2-Laboratory process. 3-Modeling. 4-Computerized simulating. 5- Optimizing the operations. Basic Contractor Mahshahr Azad University Description Contract Code 77/094 IN SPITE OF TRANSFUSING THE PREVENTING MATERIALS OF SEDIMENT AND CORROSION PRODUCTION INTO CIRCULATING WATER IN HEAT EXCHANGERS THE SEDIMENT PRODUCES AND CAUSES TO DECTEASE THE EXCHANGERS EFFICIENCY AND MAKING DIFFICULTIES IN THE UNIT AND COMPLEX. ALSO RESTARTING THESE EXCHANGERS UNDERTAKES THE COSTS FOR THE COMPLEX