Project Details Consideration of rubber replacement with other suitable coats, designing and destructing the corrosion test pilot Consideration of rubber replacement with other suitable coats, designing and destructing the corrosion test pilot Status: Completed Registration Date 2008/11/04 Update Date 2008/11/04 Goals Considering and testing of internal coats such as rubber Schedule Commencement Date : 11/26/2000 Duration : 9Months Basic Contractor Ms. Shafi Khni – Iran technology and scientific researching institute –Isfahan Description Contract Code : 79/085Various material are used in phosphoric acid unit equipments. One of the most common materials in this unit is Carbon Steel Metal with rubber linear which providing the rubber has been always difficult. A project titled consideration of rubber replacement with suitable coats is defined and performed by Iran technology and scientific researches organization. A pilot has designed and made for rubber replacement samples test which is able to test internal coats in corrosion environment conditions and under different temperatures statically and dynamically.